Guernsey Build 7 – Plasterboard

With the first fix plumbing and electrical work completed, the interior walls and ceilings of this project in Guernsey were covered with plasterboard.

Guernsey Build

Plasterboard sheets were fixed to the structural timber battens throughout the new home.

Guernsey Self Build

In areas likely to become humid, such as bathrooms and kitchens, moisture-resistant boards that contain water-repellent additives were used.

Plasterboard

The seams between the sheets were taped and jointed to cover and strengthen the gaps between the boards.

Plasterboarding

This method serves as an alternative to wet plastering and can be preferred in certain situations as not only does it prevent potential cracking issues but it is also quicker, avoiding the need for drying time.

Guernsey Build Plasterboard

As a result, this technique leads to cost savings and a faster overall project timeline.

Plasterboarded Timber Frame

The plasterboard stage is significant in the construction process, as it covers the timber frame structure, allowing the building site to begin resembling a home.

Meanwhile, the scaffolding outside has been removed, allowing the contemporary exterior finishes to be fully appreciated.

Guernsey Timber Frame Home