Self Build Home Diary – 3

Beam Block Floor

The beam and block floor has been finished atop the foundations and the block upstand built for the timber frame to be erected.

Self Build Site

The scaffolding will be put up shortly in anticipation of the shell arrival next week. The timber frames will be assembled simultaneously across both sites. 

Upstand Timber Frame

Comments are closed.