Week 25 – Traditional Tudor Style Photo Build Diary
Categories: Show Office Build Diary
After the underfloor heating pipes have been laid, a dry mix screed is laid between the battens on the first floor.
A second layer of 12mm ply is fixed to the battens to form the top layer of the floor sandwich.
Comments are closed.