Guernsey Build 7 – Plasterboard

June 16, 2025

With the first fix work completed, the interior walls and ceilings of this project in Guernsey were covered with plasterboard.

Guernsey Build

 

Plasterboard sheets were fixed to the structural timber battens throughout the new home.

Guernsey Self Build

 

In areas likely to become humid, such as bathrooms and kitchens, moisture-resistant boards that contain water-repellent additives were used.

Plasterboard

 

The seams between the sheets were taped and jointed to cover and strengthen the gaps between the boards.

Plasterboarding

 

This method serves as an alternative to wet plastering and can be preferred in certain situations as not only does it prevent potential cracking issues but it is also quicker, avoiding the need for drying time.

Guernsey Build Plasterboard

 

As a result, this technique leads to cost savings and a faster overall project timeline.

Plasterboarded Timber Frame

 

The plasterboard stage is significant in the construction process, as it covers the timber frame structure, allowing the building site to begin resembling a home.

 

Meanwhile, the scaffolding outside has been removed, allowing the contemporary exterior finishes to be fully appreciated.

Guernsey Timber Frame Home

More posts:

As work continues at pace on this bespoke timber frame home, another exciting milestone has been reached with the installation

Construction continues to move forward with the installation of plasterboard. Following the successful completion of the first fix plumbing, carpentry,

The exterior envelope of the timber frame structure has been completed, with a combination of render, natural stone and composite

Another important stage in the construction process was completed with the installation of the underfloor heating system and the pouring

With the structural shell of the new bungalow complete, work moved swiftly onto the first fix stage and fitting of

Why not visit our self build show village in the heart of West Sussex