Inside this building project in Guernsey the underfloor heating system was installed and screed was poured.

Floor Insulation

 

The 150mm PIR insulation boards, which will add to the warmth and energy efficiency of the new home, were placed on the beam and block flooring and the underfloor heating pipes were then arranged on top.

Floor Construction

 

The underfloor heating we install into our timber frame homes is a wet system which is designed specifically for each project, taking into consideration heat loss and required output.

Ground Floor Insulation

 

Underfloor heating systems are a popular choice for those building their own home as they come with several advantages.

Underfloor Heating System

 

The heat the underfloor pipes produce is consistent, distributing warmth evenly throughout entire rooms, ensuring a comfortable temperature even in large open-plan spaces.

Underfloor Heating

 

Underfloor heating is efficient, requiring less energy to maintain the temperature of rooms compared to traditional radiator systems. This minimises energy consumption and therefore heating bills. Combining an underfloor heating system with our airtight timber frame, high levels of insulation and triple glazing results in a warm, energy-efficient and economical home.

Underfloor Heating System Pipes

 

As pipes are hidden within the floors, they free up space in a room compared to wall-hung radiators that dictate where furniture can be placed. Having this flexibility for layouts can simplify the interior design process for clients.

Screed

 

The underfloor heating pipes are held in place by clip rails and liquid screed is then poured. Once dried, the screed creates a smooth and level surface which will be covered by the final floor finish towards the end of the build project.

More posts:

As work continues at pace on this bespoke timber frame home, another exciting milestone has been reached with the installation

Construction continues to move forward with the installation of plasterboard. Following the successful completion of the first fix plumbing, carpentry,

The exterior envelope of the timber frame structure has been completed, with a combination of render, natural stone and composite

Another important stage in the construction process was completed with the installation of the underfloor heating system and the pouring

With the structural shell of the new bungalow complete, work moved swiftly onto the first fix stage and fitting of

Why not visit our self build show village in the heart of West Sussex

Scandia-Hus Open Day Event

Join us on Saturday 17th October for the Scandia-Hus Open Day at our Self Build Show Centre in Sussex.