Guernsey Build 1 – Groundworks

January 13, 2025

Guernsey is an ideal location to build a home and Scandia-Hus were delighted to be involved in a project on the island.

Guernsey Self Build Plot

 

The second largest of the Channel Islands, Guernsey benefits from miles of scenic coastline, a mild climate and a strong sense of community. Scandia-Hus were delighted to be involved in this build project on the island, supplying our high-quality timber frame from our Sussex factory as well as providing a full turnkey project management service through our knowledgeable team.

Self Build Groundworks

 

The first stage of the construction process was to clear the site; the existing dilapidated bungalow and outbuildings were carefully demolished with all local Guernsey stone being kept to one side ready to be repurposed later, following this the topsoil was removed and trenches were dug in preparation for the foundations.

Foundations Blockwork

 

The soil conditions along with the design of the building determine the type, depth and width of foundations required.

Guernsey Build

 

The design and construction of foundations are crucial elements in any building project, often representing a significant portion of the overall budget. Fortunately, for the majority of our projects, cost-effective trench-fill foundations are typically the ideal solution, offering both time and cost savings.

Beam and Block

This method involves digging trenches for both the outer and load-bearing walls, which are then filled with concrete. Where necessary, steel reinforcement is added to ensure structural integrity. Once the concrete has set, trench blocks are laid to a specified height in preparation for the subfloor. This stage is particularly critical, as precision is key to ensuring a level and square platform for the next phase of construction.

Groundworks

Following this, the beam and block floor system is installed. Precast concrete beams span the distance between the supporting walls, with blocks placed across the gaps to create a solid and stable foundation for the building. The offsite nature and swift assembly of a beam and block floor make it an efficient flooring system.

Foundations Ready for Timber Frame

 

With the foundations complete, the site was ready for delivery of the timber frame kit from our factory.

More posts:

As work continues at pace on this bespoke timber frame home, another exciting milestone has been reached with the installation

Construction continues to move forward with the installation of plasterboard. Following the successful completion of the first fix plumbing, carpentry,

The exterior envelope of the timber frame structure has been completed, with a combination of render, natural stone and composite

Another important stage in the construction process was completed with the installation of the underfloor heating system and the pouring

With the structural shell of the new bungalow complete, work moved swiftly onto the first fix stage and fitting of

Why not visit our self build show village in the heart of West Sussex

Scandia-Hus Open Day Event

Join us on Saturday 17th October for the Scandia-Hus Open Day at our Self Build Show Centre in Sussex.